Cycling in Sydney Australia
Permalink Reply by Snowy_5 on December 21, 2011 at 7:47pm Thanks for info,John.I didn`t ride all the way as I saw no one there when I rode home fom work.
600m is not enough and it would be good if it is on entire M4 from Parra to Emu Plains as I rode on road and there`s too many debris on it,when I rode home from Rob`s CAMWEST ride to cause me puncture before I change into Schwalbe tyres.Like those on M7.
Permalink Reply by Peter H on December 22, 2011 at 5:10am Does it allow access back onto the M4 westbound?
Permalink Reply by Snowy_5 on December 30, 2011 at 11:05pm No,it don`t.I rode up to see if it is but I see narrow path after footbridge to Burnett st then I turned round to head home.Not happy of it.
Permalink Reply by mark robson on January 4, 2012 at 8:15am Hi guys,
My understanding is that the intention is that you continue directly West along that narrow footpath;
across Burnett St at the slightly redesigned traffic lights and join up with the T-Way path beside Rita St. I've ridden this in both directions and; well, it's ridable, but pretty awful and well below standard. I'm sure the intention is to concrete over this narrow bit through Ledger Park sooner rather than later. A couple of direction signposts at the Western end are needed by the sound of things.
I've also learned through cyclists' word of mouth that a young person was killed crossing Pitt St here and that's why we now have an underpass. This is total hearsay but the person seemed sure and genuine about it.
If and when the section from Ledger St to Rita St is concreted properly then there will be straight path beside the M4 from Olympic Park to the Cumberland Highway. The question is; where next? Do we want this path to continue Westwards towards Blacktown or follow the M4 all the way to Penrith. A diversion away from the M4 into a more populated area would make sense to me.
Permalink Reply by Snowy_5 on January 11, 2012 at 7:40pm Back to work after chrisssie break today.Rode past it and it is still not opened yet.No workers at site.
Permalink Reply by Snowy_5 on January 25, 2012 at 7:14pm Rode past it to work this morning and the temporary fence had been removed.It is now opened.
Permalink Reply by Snowy_5 on January 25, 2012 at 9:15pm Thanks John for info.
$5.8m just for 675mtr of cycleway.If they make it to Penrith,then it will be years away.Why wait and the costs will inflates.If it was done 10 years ago,then the costs will be less.
Comment from wombatK on Parra Sun about Parra Pedal,it will not be back this year as I was told from BNSW staff at Springcycle last year.
© 2013 Created by DamianM.